Home › Massachusetts › Lawrence
Bathroom, Kitchen and Home Remodeling in Lawrence, MA
More than half of Lawrence's homes were built before 1940 and two in five are in two- to four-family buildings, so a remodel here is often an old multi-family job with more than one kitchen and bath. Call (978) 951-4644 or use the form. A person reads every request and replies with what happens next.
- Free for homeowners
- City and state remodeling rules on this page
- Prospect Hill to South Lawrence
Ask About Remodeling Service in Your Area
Tell us what you want to change in the building. A person reads it and replies with what happens next.
Please add your name, a 10-digit phone number and a valid email.
Your request didn't go through on our end. Please call (978) 951-4644 so it isn't lost.
Too many requests have come from this connection in a short time. Please call (978) 951-4644 and we'll take it from there.
We couldn't finish the spam check. Wait a moment and send it again, or call (978) 951-4644.
Remodeling in Lawrence
What are you changing?

Kitchen Remodeling
New layouts, cabinets and counters, with licensed trades for any plumbing, gas and electrical work.

Bathroom Remodeling
Tub-to-shower conversions, full gut renovations and added bathrooms, permitted the way your town requires.

Additions & Whole-Home
Additions, dormers, second stories and whole-house renovations, with the structural permits and zoning they bring.

Attic & Basement Finishing
Turning an attic or a dry basement into living space, with the building department involved from the start.
Updating a multi-family?
(978) 951-4644Tell us about the building and which units you want to update, and we'll connect you with a contractor who works with Lawrence Inspectional Services.
Permits
Remodeling permits in Lawrence
Inspectional Services. The Inspectional Services Department, which also enforces the housing code, processes and issues the city's permits, licenses and certificates; its main line is 978-620-3130 (Inspectional Services). Applications are filed through Citizenserve, open around the clock to homeowners and contractors, and the Electrical Inspector works out of the Fire Department at 65 Lowell Street (Online Permit Application).
Fees. The department's fee page, as posted in November 2026, charges $12.00 per $1,000.00 for an addition or alteration, gas permits at $21.00 plus $7.00 per unit, and $75 for an occupancy permit (Inspectional Services Department Fees). The page carries no effective date, so confirm amounts when you file.
- Office
- Inspectional Services Department, 978-620-3130
- Online filing
- Citizenserve, 24/7
- Addition or alteration
- $12.00 per $1,000.00 (fee page as posted in November 2026)
- Electrical Inspector
- Fire Department, 65 Lowell Street
- Prospect Hill Historic District
- Certificate before any permit for visible exterior work
- Energy code
- Stretch Code since January 1, 2018
What needs a permit. City pages don't spell out which remodels need a building permit, so the state code governs: cutting away a wall, removing or cutting a beam or load-bearing support, or changing a required exit all need one, while painting, cabinets, counters and tile alone do not (780 CMR 51.00, chapter 1). Plumbing and gas permits issue only to licensed individuals (248 CMR 3.05), and electrical work needs a licensed electrician (c.141 §1A). Lawrence has been on the Stretch Code since January 1, 2018, not the Specialized Code (energy code adoption by municipality); an extensive alteration of a one- or two-family home over 1,000 square feet or over 100% of the existing conditioned floor area must meet HERS limits (225 CMR 22).
State contractor rules. If you live in the building and it has one to four units, the contractor must be a registered Home Improvement Contractor (Contractor Hub lookup); the program does not cover investment properties or buildings over four units (HIC homeowner resources). A job over $1,000 needs a written contract with the registration number, dates, price and payment schedule, a deposit of no more than one-third unless special-order materials cost more, and notice of the three-day cancellation right (c.142A §2). Structural work on a one- or two-family house is supervised by a licensed construction supervisor or registered design professional (construction supervisor rules). An owner who pulls the permit gives up the Guaranty Fund, worth up to $25,000 of actual losses. Smoke alarms must be photoelectric, with a CO alarm on every story including the basement (780 CMR 51.00, chapter 3).
Last verified November 2026. Fees, restrictions and deadlines on this page are due for re-checking by November 2027. New England Remodeling Pros is a referral service. We don't do the work; the contractor pulls the permits.
Zoning
Adding on in Lawrence
Setbacks. We could not read Lawrence's residential setbacks or lot coverage limits on the city site in November 2026, so ask the city about your lot before an addition is drawn. Under state law, a nonconforming single- or two-family house can be altered or extended without the board's “not substantially more detrimental” finding only where the change doesn't increase the nonconforming nature (c.40A §6); on the city's tight lots, that is the first question for most additions.
Accessory dwelling units. We found no Lawrence ADU page or ordinance, so the state rule is the guide: one ADU is allowed by right in single-family zoning districts, no larger than half the principal dwelling or 900 square feet, whichever is smaller, with a separate entrance and a building permit. Cities can't require owner occupancy, a special permit or more than one parking space, and none within half a mile of a commuter rail, subway, ferry or bus station (state ADU rules). With 40% of the city's homes in two- to four-unit buildings (Housing Production Plan 2018–2022), many remodels involve multi-family buildings rather than single-family zoning.
Wetlands and floodplain. Septic is rarely a factor in Lawrence, but wetlands are. The city's posted wetland protection regulations, a March 2017 revision, regulate a 100-foot buffer, with a 25-foot No Disturbance zone and a further 25-foot No Build zone; its definition of altering includes excavating, filling and changing drainage (wetland protection regulations). The city's fee form puts additions on a single-family lot in its Group A notice of intent category (wetland fee form). Disturbing more than 5,000 square feet that will drain to a combined sewer also needs a city stormwater permit (stormwater permit application).
Historic review
Old houses and historic review in Lawrence
Prospect Hill Historic District. The local district covers both sides of Ferry Street, Prospect Street and East Haverhill Street plus a few listed addresses. No building or structure there may be built, demolished, moved or altered without a certificate of appropriateness, hardship or non-applicability, and the building inspector cannot issue a permit without one; at-grade terraces, walks, driveways and steps and paint color are excluded (historic district ordinance). The commission's rules cover changes visible from a public street, way, park or body of water, and count fences and walls as structures (Prospect Hill commission rules).
Outside Prospect Hill. The Historical Commission surveys buildings to identify those of historic significance (Historical Commission); we found no demolition delay rule in Lawrence.
Lead and asbestos. With so much pre-1940 housing, lead rules apply to most remodels: in a home built before 1978, Massachusetts requires a licensed lead-safe renovation contractor for renovation, repair or painting (MA lead-safe renovation), and the federal rule always covers window replacement and demolition of painted surfaces (EPA RRP). MassDEP requires an asbestos survey before any renovation or demolition (asbestos survey guide).
Lawrence's homes
Mill-city housing, from row houses to Second Empire two-families
The city's 2018–2022 Housing Production Plan counts 53% of Lawrence homes as built before 1940, against 34% statewide, and about 83% before 1979; 12% of units are in two-unit buildings and 28% in three- or four-unit buildings (Housing Production Plan 2018–2022).


The state's reconnaissance survey describes brick mill boarding houses, attached brick row houses on Union, Orchard and Garden Streets, Greek Revival double houses and small frame cottages, large slate-roofed two-family Second Empire houses on the plains, and Italianate and Second Empire merchants' houses on Haverhill Street and the Common. Prospect Hill was an affluent neighborhood of spacious homes by the late 1870s, and Tower Hill grew in the late 19th and early 20th centuries (MHC reconnaissance report). In buildings like these, a kitchen or bath remodel often means working around stacked units, shared walls and old painted surfaces.
FAQ
Lawrence remodeling questions
How do I apply for a remodeling permit in Lawrence?
Online through Citizenserve, which the city says gives homeowners and contractors access 24 hours a day, 7 days a week. The Inspectional Services Department at 978-620-3130 issues the permits; the Electrical Inspector is reached at the Fire Department, 65 Lowell Street.
What does Lawrence charge for an addition or alteration permit?
The Inspectional Services fee page, as posted in November 2026, lists $12.00 per $1,000.00 for additions and alterations, the same rate as new construction. Gas permits are $21.00 plus $7.00 per unit. The page shows no effective date, so confirm the amount when you apply.
Do I need approval to change the outside of a house on Prospect Hill?
Yes, for anything visible from a public street, way, park or body of water. The building inspector cannot issue a permit in the Prospect Hill Historic District without a certificate from the commission, and fences and walls count as structures. Paint color and at-grade walks, driveways and steps are excluded.
Can I build near the Spicket or Shawsheen River?
Only outside tight limits. The city's posted wetland protection regulations (a March 2017 revision) set a 100-foot buffer and keep a 25-foot No Disturbance zone and a further 25-foot No Build zone. An addition on a single-family lot inside that zone files a notice of intent with the city.
What does it cost me to use New England Remodeling Pros?
Nothing. Asking is free for homeowners; the contractor prices the job, and the price and contract are between you and them.
Nearby